Hi Gurus ,
We have scheduled the MRP in background (Program - RMMRP000) & we are using User exit parameter (Exit -EXIT_SAPMM61X_001 ) in variant , so that it should only run MRP for materials belong to for few MRP type .
But as checked & found that neither MRP is able to generate the procurement proposal even if we have planning file entries for materials (Please note that we are using processing key as “NETCH”) nor it is showing any kind of planning termination message in MD05 .
Though it is working perfectly fine in Quality system & configuration in both the server are same . Please let me know if we are missing something or there could be any kind of authorization related issue we are facing in PRD. Do we any provision to control the background job related to MRP or manual MRP run based on MRP type which could be missing & due to this we are facing this problem .
Thanks ,
Regards,
Aman