Hi Gurus   ,

We  have scheduled the MRP in  background  (Program - RMMRP000) & we are  using User exit parameter (Exit -EXIT_SAPMM61X_001 )  in variant ,  so that  it should only run MRP for materials belong to  for few MRP type  .

 

But as checked & found  that neither  MRP is  able to generate the procurement proposal even  if we have planning file entries for materials  (Please note  that we are using processing  key as “NETCH”)  nor it is  showing  any kind of planning termination message  in MD05  .

 

Though it is working perfectly fine in Quality system  & configuration  in both the server are same . Please let me know if we are missing something  or there could be any kind of authorization related issue we are facing  in PRD. Do we any provision to control the background job  related to MRP  or manual  MRP run based on MRP type which could  be missing & due to this we are facing this problem  .

 

Thanks ,

Regards,

Aman