Hi Experts,
When run MRP for a material (MRP type PD), it is generating planned orders for the requirements (reservations) whose requirement date is well beyond the planned delivery time of the material. What settings should I make in order to create planned for the requirements which are within the
replenishment lead time.
Attached document has screen shots that explains the current situation.
Br, Surya