Hi All,
We are facing an issue while configuring 'Technical Preparation' step in Data Volume Management in Solution Manager. Below are the details:
Error log:
"Configuration for PSH~440 not performed
Lock entry _CMTD exists for coding part U02 of project CMC .
Subroutine CMC_RFC_INTERFACE not found/not executable."
FYI, the system is PSH, a SOLMAN system (SAP EHP1 for Solution Manager 7.0), and the current version of ST-PI is Rel:2008_1_700 Level 4; and of ST-A/PI is Rel:01N_700SOL Level 0.
Can someone please help on this issue.
Regards,
Soumyojit